Replies: 3 comments
-
Development steps[1] MVPReservoir level between 0 and 1. No inflows, no rule curves, cycle = simplex opt. range (weekly / daily) [2] Add rule curves & inflowsAdd rule curves & inflows [3] Add storage cycleStorage cycle induce additional constraints [4] Free initial level (calibration)[5] Forbid simultaneous injection & withdrawal |
Beta Was this translation helpful? Give feedback.
0 replies
-
Optimization problemImpose the initial levelFree initial level |
Beta Was this translation helpful? Give feedback.
0 replies
-
SIMThe plan is to use SIM only as an abstraction layer for the calendar & time-series.
OPT
|
Beta Was this translation helpful? Give feedback.
0 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
-
Input file format changes
Time-series
Properties
One file list.ini per area, with properties
Output file format changes
Values
Pre-simulation checks
List incompatible parameters, incoherent data, etc. that would make it impossible to carry out a simulation. It's better to fail earlier than later.
Check on parameters
Check on time-series
0 <= inflow(h)Changes to the optimization problem
For each STS, add 3 hourly variables
Beta Was this translation helpful? Give feedback.
All reactions