Skip to content

Added geospatial analysis via dask #238

Added geospatial analysis via dask

Added geospatial analysis via dask #238

Re-run triggered September 27, 2023 22:19
Status Failure
Total duration 3h 28m 53s
Artifacts

pytest.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.11, -r requirements.txt .[test])
Process completed with exit code 1.
build (3.11, --upgrade --upgrade-strategy=eager .[test])
The job was canceled because "_3_11_-r_requirements_txt" failed.
build (3.9, -r requirements.txt .[test])
The job was canceled because "_3_11_-r_requirements_txt" failed.
build (3.9, --upgrade --upgrade-strategy=eager .[test])
The job was canceled because "_3_11_-r_requirements_txt" failed.
build (3.10, -r requirements.txt .[test])
The job was canceled because "_3_11_-r_requirements_txt" failed.
build (3.10, --upgrade --upgrade-strategy=eager .[test])
The job was canceled because "_3_11_-r_requirements_txt" failed.
build (3.10, --upgrade --upgrade-strategy=eager .[test])
The operation was canceled.