Skip to content

Commit

Permalink
Added table with BRT boardings for Rapid 637 sensitivity test
Browse files Browse the repository at this point in the history
  • Loading branch information
JoeJimFlood committed Sep 8, 2023
1 parent 6e460df commit 44642b9
Showing 1 changed file with 2 additions and 2 deletions.
4 changes: 2 additions & 2 deletions docs/assessment.md
Original file line number Diff line number Diff line change
Expand Up @@ -102,5 +102,5 @@ The removal of the toll on SR-125 (The South Bay Expressway) was tested in both

#### Rapid 637 BRT

TODO: Add some text to explain how this test was performed using the study area parameter
TODO: Add outcome screenshot
Tests were conducted that added the planned Rapid 637 line from North Park to the Naval Facilities to the base year network. Without the study area definition there were around 3,000 boardings from the RSM, but the addition of a study area resulted in a value much closer to the one produced by ABM2+.
![](images\assessment\Boarding_comparison_Rapid_637_BRT.PNG)

0 comments on commit 44642b9

Please sign in to comment.