You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Describe the bug
Whenever I duplicate a project all the tasks (and sub-tasks) that I have set "Use as note" in the original, automatically turns into tasks in the duplicated one. It requires manually turning all the tasks into notes again.
To Reproduce
Steps to reproduce the behavior:
Create a new project
Add tasks with sub-tasks
Turn them into notes by using "three dots" in the details side bar
Duplicate the entire project
You will see the new duplicated project turns all the notes into tasks
Expected behavior
The duplicated project should be exactly the same as the original.
Screenshots
Original Project:
Duplicated Project:
Desktop:
OS : Pop!_OS 22.04 LTS
DE: Gnome Version 42.9
Window Manager: Mutter (X11)
Kernel: Linux 6.9.3
App Version: 4.11.5 ( Flatpak)
Additional context
I duplicate projects very often because of how I use planify. I have to turn every single tasks into note again manually because of this issue which takes a lot of time.
The text was updated successfully, but these errors were encountered:
Describe the bug
Whenever I duplicate a project all the tasks (and sub-tasks) that I have set "Use as note" in the original, automatically turns into tasks in the duplicated one. It requires manually turning all the tasks into notes again.
To Reproduce
Steps to reproduce the behavior:
Expected behavior
The duplicated project should be exactly the same as the original.
Screenshots
Original Project:
Duplicated Project:
Desktop:
App Version: 4.11.5 ( Flatpak)
Additional context
I duplicate projects very often because of how I use planify. I have to turn every single tasks into note again manually because of this issue which takes a lot of time.
The text was updated successfully, but these errors were encountered: