[DPE-5591] refactor: Rework status handling #1733
Triggered via pull request
October 30, 2024 16:05
Status
Success
Total duration
2h 23m 36s
Artifacts
2
ci.yaml
on: pull_request
Matrix: Build charms
sync-docs
/
Open PR with docs changes
2m 7s
Matrix: integration-test
Matrix: integration-test-ha
Annotations
1 warning
sync-docs / Open PR with docs changes
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/checkout@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
packed-charm-cache-true-.-base-0
|
13 MB |
|
packed-charm-cache-true-tests-integration-app-charm-base-0
|
6.21 MB |
|