Skip to content

chore(deps): update ubuntu docker tag to v24 #2098

chore(deps): update ubuntu docker tag to v24

chore(deps): update ubuntu docker tag to v24 #2098

Triggered via pull request November 13, 2024 19:24
Status Failure
Total duration 3m 9s
Artifacts 1

integration_test.yaml

on: pull_request
integration-tests  /  Plan
3s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests  /  Plan Image Scanning
0s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
3s
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration-tests / Build rock (synapse)
The process '/snap/bin/rockcraft' failed with exit code 1
integration-tests / Build charm (synapse)
The job was canceled because "rock_synapse_synapse_rock" failed.
integration-tests / Build charm (synapse)
The operation was canceled.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
2024-11-13T19-24-32-8275__plan
331 Bytes