vine: priority queue implementation #9
Triggered via pull request
August 20, 2024 15:55
Status
Failure
Total duration
1h 0m 26s
Artifacts
–
testing.yml
on: pull_request
build-conda-linux
1h 0m
lint
36s
Matrix: build-conda-macos-arm64
Matrix: build-conda-macos-x86_64
Matrix: build-native-linux
Annotations
14 errors
build-native-linux (almalinux9)
The job running on runner GitHub Actions 54 has exceeded the maximum execution time of 30 minutes.
|
build-native-linux (almalinux9)
The operation was canceled.
|
build-native-linux (ubuntu20.04)
The job running on runner GitHub Actions 37 has exceeded the maximum execution time of 30 minutes.
|
build-native-linux (ubuntu20.04)
The operation was canceled.
|
build-native-linux (almalinux8)
The job running on runner GitHub Actions 40 has exceeded the maximum execution time of 30 minutes.
|
build-native-linux (almalinux8)
The operation was canceled.
|
build-conda-macos-x86_64 (macos-12)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 30 minutes.
|
build-conda-macos-x86_64 (macos-12)
The operation was canceled.
|
build-conda-macos-arm64 (macos-14)
The job running on runner GitHub Actions 59 has exceeded the maximum execution time of 30 minutes.
|
build-conda-macos-arm64 (macos-14)
The operation was canceled.
|
build-conda-macos-x86_64 (macos-13)
The job was canceled because "macos-12" failed.
|
build-conda-macos-x86_64 (macos-13)
The operation was canceled.
|
build-conda-linux
The job running on runner GitHub Actions 50 has exceeded the maximum execution time of 60 minutes.
|
build-conda-linux
The operation was canceled.
|