Elyra Tests #6377
build.yml
on: schedule
Prepare Cache
1m 54s
Lint Server
14s
Test documentation build
14s
Validate Images
16m 44s
Matrix: Test Server
Matrix: Validate Image Environment
Annotations
9 errors
Test Server (3.9)
Process completed with exit code 2.
|
Test Server (3.10)
The job was canceled because "_3_9" failed.
|
Test Server (3.10)
The operation was canceled.
|
Test Server (3.8)
The job was canceled because "_3_9" failed.
|
Test Server (3.8)
The operation was canceled.
|
Test Server (3.11)
The job was canceled because "_3_9" failed.
|
Test Server (3.11)
The operation was canceled.
|
Test UI
Process completed with exit code 2.
|
Run Integration Tests
Process completed with exit code 2.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
artifact
Expired
|
1.63 KB |
|