Skip to content

Elyra Tests

Elyra Tests #6389

Triggered via schedule September 17, 2023 10:01
Status Failure
Total duration 22m 50s
Artifacts

build.yml

on: schedule
Lint Server
21s
Lint Server
Test documentation build
14s
Test documentation build
Validate Images
14m 29s
Validate Images
Matrix: Test Server
Matrix: Validate Image Environment
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Test Server (3.8)
Process completed with exit code 2.
Test Server (3.9)
The job was canceled because "_3_8" failed.
Test Server (3.9)
The operation was canceled.
Test Server (3.10)
The job was canceled because "_3_8" failed.
Test Server (3.10)
The operation was canceled.
Test Server (3.11)
The job was canceled because "_3_8" failed.
Test Server (3.11)
The operation was canceled.