Skip to content

refactor transition matcher to use prism #6

refactor transition matcher to use prism

refactor transition matcher to use prism #6

Triggered via push August 13, 2024 22:19
Status Failure
Total duration 24s
Billable time 3m
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

4 errors
test (3.1)
Process completed with exit code 1.
test (3.3)
The job was canceled because "_3_1" failed.
test (3.2)
The job was canceled because "_3_1" failed.
test (3.2)
The operation was canceled.