You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository has been archived by the owner on Feb 21, 2019. It is now read-only.
We need a breakdown of points by project. We've got two projects and during sprint planning, we need to make sure neither project gets more than its fair share of points. The only way to do that now is manually which is difficult.
One idea I had was to extend the text:
Stories: [Points=37]
And do a breakdown:
Stories: [20 (SUMO) + 11 (Input) = 31]
Or something along those lines.
Another idea I had is to change the top of the Manage Stories page such that it shows all the breakdowns: project, component, user, points, ...
The text was updated successfully, but these errors were encountered:
Definitely need this. I've wanted to do dynamically updating pie charts to match what they'll look like in the sprint, but add the project chart. I think that chart would also be useful on the sprint page for sprints containing multiple projects.
Sign up for freeto subscribe to this conversation on GitHub.
Already have an account?
Sign in.
We need a breakdown of points by project. We've got two projects and during sprint planning, we need to make sure neither project gets more than its fair share of points. The only way to do that now is manually which is difficult.
One idea I had was to extend the text:
And do a breakdown:
Or something along those lines.
Another idea I had is to change the top of the Manage Stories page such that it shows all the breakdowns: project, component, user, points, ...
The text was updated successfully, but these errors were encountered: