[release-v1.16] Run make generate-release
#964
Red Hat Konflux / Red Hat Konflux / kn-eventing-test-wathola-forwarder-116-on-pull-request
failed
Nov 19, 2024 in 12m 22s
Failed
Red Hat Konflux/kn-eventing-test-wathola-forwarder-116-on-pull-request has failed.
Details
- Namespace: ocp-serverless-tenant
- PipelineRun: kn-eventing-test-wathola-forwarder-116-on-pull-request-cmrnj
Task Statuses:
Status | Duration | Name |
---|---|---|
✅ Succeeded | 2 minutes | |
✅ Succeeded | 2 minutes | |
✅ Succeeded | 1 minute | |
❌ Failed | 4 minutes |
Failure snippet:
task build-images has the status "Failed":subprocess exited with status 1 subprocess exited with status 1 Error: building at STEP "RUN microdnf update tzdata -y && microdnf reinstall tzdata -y": exit status 1
Loading