Testing and Finalizing Deployment

This rapid 4 week iteration is focused on testing and executing the deployment plan created in IT7 in the lab for release.

Question(s) Being Answered:

This iteration, we will be implementing a set of queries as a single batch or Query Set. These queries will be based on what was defined in IT6 and may expand on it.

For more details on these queries, see IT6 Queries

Rationale:

One of the elements needed for the overall design is the ability to run (and rerun) sets of queries. These can be related queries in the sense of multiple, related queries (e.g. data quality queries that support interpretation of the main query) or they may be a batch of queries that are run routinely (e.g. in the case of the AMCARE query set).

The main goal of this iteration is to deploy with physical hardware and begin live testing. This would allow us to documented challenges encountered while setting up a SCOOP Endpoint system in a clinic.

Secondary goals for this iteration includes:

  • Tightening and refining deployment scripts
  • Tighten scoop-deploy code

To contain the scope of the query set, the sub-set of AMCARE queries has been chosen that should cover data elements that are currently included in the OSCAR E2E exporter. Additional mapping may occur in this iteration in preparation for including the full query set, once it has been documented and shared by AMCARE.

Features:

See Features for Iteration 9

Current Iteration: 13

General Topics

Resources


Previous Iteration: 12

Previous Iteration: 11

Previous Iteration: 10

Previous Iteration: 9

Previous Iteration: 8

Previous Iteration: 7

Previous Iteration: 6

Previous Iteration: 5

Previous Iteration: 4

Previous Iteration: 3

Previous Iteration: 2

Previous Iteration: 1

Previous Iteration: 0

Clone this wiki locally