Skip to content

switch to go-1.21 and add clickhouse-server:23.8 for integration and … #653

switch to go-1.21 and add clickhouse-server:23.8 for integration and …

switch to go-1.21 and add clickhouse-server:23.8 for integration and … #653

Triggered via push September 6, 2023 19:29
Status Failure
Total duration 21m 34s
Artifacts 1

build.yaml

on: push
Matrix: Build
Matrix: Test
Matrix: Testflows
Cleanup
3s
Cleanup
Fit to window
Zoom out
Zoom in

Annotations

19 errors
Test (1.21, 1.1.54394)
Process completed with exit code 1.
Test (1.21, 20.8)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 20.8)
The operation was canceled.
Test (1.21, 20.3)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 23.8)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 20.3)
The operation was canceled.
Test (1.21, 23.8)
The operation was canceled.
Test (1.21, 21.8)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 21.8)
The operation was canceled.
Test (1.21, 21.3)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 21.3)
The operation was canceled.
Test (1.21, 23.3)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 23.3)
The operation was canceled.
Test (1.21, 22.3)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 22.3)
The operation was canceled.
Test (1.21, 19.17)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 19.17)
The operation was canceled.
Test (1.21, 22.8)
The job was canceled because "_1_21_1_1_54394" failed.
Test (1.21, 22.8)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-test-artifacts Expired
141 MB