Skip to content

Merge pull request #27 from DataChefHQ/refactor/optimize-ci #136

Merge pull request #27 from DataChefHQ/refactor/optimize-ci

Merge pull request #27 from DataChefHQ/refactor/optimize-ci #136

Triggered via push November 7, 2024 09:30
Status Failure
Total duration 6h 0m 28s
Artifacts

test.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
macos_tests
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
macos_tests
The operation was canceled.
macos_tests
Treating docker as a formula. For the cask, use homebrew/cask/docker or specify the `--cask` flag. To silence this message, use the `--formula` flag.