chore(deps): update dependency ws to v8 [security] #3374
build-and-test-pr.yml
on: pull_request
Turbo Affected
/
Determine Affected
29s
Test Mobile E2E
/
Ledger Live Mobile - Android Detox Tests
8m 6s
Matrix: Build Desktop / build-desktop-app
Build Mobile
/
Build LLM | Android
7m 43s
Build Mobile
/
Build LLM | iOS
6m 54s
Test Mobile
/
LLM CodeCheck
6m 30s
Test Design System
/
Design System Tests
3m 4s
Test Desktop
/
LLD Code Checks
7m 59s
Test Desktop
/
Desktop Unit Tests
5m 33s
Test Libraries
/
Test Libraries
1m 27s
Test Libraries
/
Codecheck Libraries
4m 38s
Test Libraries
/
Test Docs
2m 26s
Test Mobile E2E
/
Allure Reports Export on Server
0s
Matrix: Test Mobile E2E / Upload to Xray
Test Mobile E2E
/
Allure Reports Export on Server
0s
OK
0s
Annotations
13 errors and 4 warnings
Build Desktop / Build LLD | mac
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Desktop / Build LLD | win
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Desktop / Build LLD | win
The operation was canceled.
|
Test Desktop / LLD Code Checks
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Desktop / LLD Code Checks
The operation was canceled.
|
Build Mobile / Build LLM | Android
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Build Mobile / Build LLM | Android
The operation was canceled.
|
Test Desktop / Desktop Tests E2E (Ubuntu)
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Desktop / Desktop Tests E2E (Ubuntu)
The operation was canceled.
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Mobile E2E / Ledger Live Mobile - Android Detox Tests
The operation was canceled.
|
Test Mobile E2E / LLM - iOS Detox Tests
Canceling since a higher priority waiting request for '[PR] Build and Test-refs/pull/7595/merge' exists
|
Test Mobile E2E / LLM - iOS Detox Tests
The operation was canceled.
|
Test Libraries / Codecheck Libraries
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/github-script@v6. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Test Mobile / LLM CodeCheck
No files were found with the provided path: /home/runner/work/ledger-live/ledger-live/apps/ledger-live-mobile/lint-mobile.json. No artifacts will be uploaded.
|
Build Mobile / Build LLM | iOS
The following actions use a deprecated Node.js version and will be forced to run on node20: actions/cache@v3. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Test Mobile E2E / LLM - iOS Detox Tests
Runner pa6-r102-srv-macrunner04-runner-1 did not respond to a cancelation request with 00:05:00.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2.92.0-sha.d666a4f1d988a25934a5fb67ec4bd5d79f4bec17-linux-x86_64.AppImage
Expired
|
180 MB |
|
2.92.0-sha.d666a4f1d988a25934a5fb67ec4bd5d79f4bec17-mac.dmg
Expired
|
245 MB |
|
linux-js-bundle-metafiles
Expired
|
655 KB |
|
mac-js-bundle-metafiles
Expired
|
655 KB |
|
mobile.metafile.json
Expired
|
213 Bytes |
|
outputs-codecheck
Expired
|
298 Bytes |
|
outputs-test-libraries
Expired
|
157 Bytes |
|
outputs-test-ui
Expired
|
165 Bytes |
|