Skip to content

ci: switch tests to 24.11. #1

ci: switch tests to 24.11.

ci: switch tests to 24.11. #1

Triggered via push November 28, 2024 01:59
Status Failure
Total duration 18s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (x86_64-linux, nixos-24.11, release-24.11)
Process completed with exit code 127.
test (x86_64-linux, nixos-unstable, master)
Process completed with exit code 127.
test (aarch64-linux, nixos-24.11, release-24.11)
The job was canceled because "x86_64-linux_nixos-24_11_" failed.
test (aarch64-linux, nixos-24.11, release-24.11)
Process completed with exit code 127.
test (aarch64-linux, nixos-unstable, master)
The job was canceled because "x86_64-linux_nixos-24_11_" failed.
test (aarch64-linux, nixos-unstable, master)
Process completed with exit code 127.