Skip to content

E2e back

E2e back #158

Triggered via pull request April 26, 2024 11:41
@KostkaBrukowaKostkaBrukowa
synchronize #75
e2e-back
Status Failure
Total duration 1m 8s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 5.4.5)
Process completed with exit code 1.
test (ubuntu-latest, 5.2.2)
The job was canceled because "ubuntu-latest_5_4_5" failed.
test (ubuntu-latest, 5.2.2)
Process completed with exit code 1.
test (ubuntu-latest, 4.x)
The job was canceled because "ubuntu-latest_5_4_5" failed.
test (ubuntu-latest, 4.x)
Process completed with exit code 1.
test (windows-latest, 4.x)
The job was canceled because "ubuntu-latest_5_4_5" failed.
test (windows-latest, 4.x)
The operation was canceled.
test (windows-latest, 5.2.2)
The job was canceled because "ubuntu-latest_5_4_5" failed.
test (windows-latest, 5.2.2)
The operation was canceled.
test (windows-latest, 5.4.5)
The job was canceled because "ubuntu-latest_5_4_5" failed.
test (windows-latest, 5.4.5)
The operation was canceled.