Skip to content

Update kind-projector to 0.13.3 #265

Update kind-projector to 0.13.3

Update kind-projector to 0.13.3 #265

Triggered via pull request February 25, 2024 13:52
Status Failure
Total duration 5m 22s
Artifacts

ci.yml

on: pull_request
Matrix: Build and Test
Matrix: Publish Artifacts
Fit to window
Zoom out
Zoom in

Annotations

14 errors
Build and Test (ubuntu-latest, 2.13.12, temurin@17, js)
Process completed with exit code 1.
Build and Test (ubuntu-latest, 3.3.1, adopt-hotspot@8, jvm)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 2.12.17, adopt-hotspot@8, jvm)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 2.13.12, adopt-hotspot@11, jvm)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 3.3.1, temurin@17, js)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 3.3.1, temurin@17, js)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.1, adopt-hotspot@11, jvm)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 3.3.1, adopt-hotspot@11, jvm)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.1, temurin@17, jvm)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 3.3.1, temurin@17, jvm)
The operation was canceled.
Build and Test (ubuntu-latest, 2.13.12, temurin@17, native)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 2.13.12, temurin@17, native)
The operation was canceled.
Build and Test (ubuntu-latest, 3.3.1, temurin@17, native)
The job was canceled because "ubuntu-latest_2_13_12_t_2" failed.
Build and Test (ubuntu-latest, 3.3.1, temurin@17, native)
The operation was canceled.