Skip to content

Commit

Permalink
imp-square-backlog 4
Browse files Browse the repository at this point in the history
  • Loading branch information
jinzhangfau authored May 21, 2024
1 parent ae4d966 commit e8db021
Show file tree
Hide file tree
Showing 2 changed files with 8 additions and 0 deletions.
Binary file added Deliverables/sprint-04/imp-squared-backlog.jpg
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
8 changes: 8 additions & 0 deletions Deliverables/sprint-04/imp-squared-backlog.tsv
Original file line number Diff line number Diff line change
@@ -0,0 +1,8 @@
Title Assignees Status Priority Estimate Size Iteration
meeting with Datev to understand better about the technology Done
everybody have the access to the research material Done
SM to check with the other two absent developers Done
Gaia-X better understanding Todo
Continue creating small tasks Todo
Consider re-schedule meeting with Datev Todo
POs to have meeting with developers before each sprint to prioritize tasks on sprint backlog Todo

0 comments on commit e8db021

Please sign in to comment.