Skip to content

Initial commit

Initial commit #2

Triggered via push December 7, 2023 11:50
Status Failure
Total duration 27s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Ruby 3.2.2
Process completed with exit code 1.
Ruby 3.0.6
The job was canceled because "_3_2_2" failed.
Ruby 3.0.6
Process completed with exit code 1.
Ruby 3.1.4
The job was canceled because "_3_2_2" failed.
Ruby 3.1.4
The operation was canceled.
Ruby 2.7.8
The job was canceled because "_3_2_2" failed.
Ruby 2.7.8
The operation was canceled.