fix(sca): make the abs path to be correcnt #11733
pr-test.yml
on: pull_request
lint
/
pre-commit
1m 21s
danger-check
25s
cfn-lint
34s
mypy
/
mypy
1m 26s
performance-tests
2m 39s
dogfood-tests
4m 3s
Matrix: integration-tests
Matrix: unit-tests
Annotations
7 errors
unit-tests (3.11)
Process completed with exit code 1.
|
unit-tests (3.8)
The job was canceled because "_3_11" failed.
|
unit-tests (3.8)
The operation was canceled.
|
unit-tests (3.9)
The job was canceled because "_3_11" failed.
|
unit-tests (3.9)
The operation was canceled.
|
unit-tests (3.10)
The job was canceled because "_3_11" failed.
|
unit-tests (3.10)
The operation was canceled.
|