break(general): remove level up flow #11779
pr-test.yml
on: pull_request
lint
/
pre-commit
1m 10s
danger-check
25s
cfn-lint
29s
mypy
/
mypy
1m 44s
performance-tests
2m 42s
dogfood-tests
5m 20s
Matrix: integration-tests
Matrix: unit-tests
Annotations
8 errors
lint / pre-commit
Process completed with exit code 1.
|
unit-tests (3.11)
Process completed with exit code 1.
|
unit-tests (3.10)
The job was canceled because "_3_11" failed.
|
unit-tests (3.10)
The operation was canceled.
|
unit-tests (3.9)
The job was canceled because "_3_11" failed.
|
unit-tests (3.9)
The operation was canceled.
|
unit-tests (3.8)
The job was canceled because "_3_11" failed.
|
unit-tests (3.8)
The operation was canceled.
|