fix(sast): fix sast reachability report format #11794
pr-test.yml
on: pull_request
lint
/
pre-commit
1m 14s
danger-check
25s
cfn-lint
32s
mypy
/
mypy
1m 14s
performance-tests
2m 40s
dogfood-tests
4m 12s
Matrix: cdk-integration-tests
Matrix: integration-tests
Matrix: sast-integration-tests
Matrix: unit-tests
Annotations
7 errors
cdk-integration-tests (3.8, ubuntu-latest)
Process completed with exit code 1.
|
cdk-integration-tests (3.8, macos-latest)
The job was canceled because "_3_8_ubuntu-latest" failed.
|
cdk-integration-tests (3.8, macos-latest)
The operation was canceled.
|
sast-integration-tests (3.8, ubuntu-latest)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
sast-integration-tests (3.8, ubuntu-latest)
The operation was canceled.
|
sast-integration-tests (3.8, macos-latest)
The job was canceled because "_3_8_ubuntu-latest" failed.
|
sast-integration-tests (3.8, macos-latest)
The operation was canceled.
|