fix(sast): fix sast reachability report format #11801
pr-test.yml
on: pull_request
lint
/
pre-commit
55s
danger-check
22s
cfn-lint
31s
mypy
/
mypy
1m 1s
performance-tests
2m 21s
dogfood-tests
3m 47s
Matrix: cdk-integration-tests
Matrix: integration-tests
Matrix: sast-integration-tests
Matrix: unit-tests
Annotations
8 errors
mypy / mypy
Process completed with exit code 1.
|
cdk-integration-tests (3.8, ubuntu-latest)
Process completed with exit code 1.
|
cdk-integration-tests (3.8, macos-latest)
The job was canceled because "_3_8_ubuntu-latest" failed.
|
cdk-integration-tests (3.8, macos-latest)
The operation was canceled.
|
sast-integration-tests (3.8, ubuntu-latest)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
sast-integration-tests (3.8, ubuntu-latest)
Process completed with exit code 143.
|
sast-integration-tests (3.8, macos-latest)
The job was canceled because "_3_8_ubuntu-latest" failed.
|
sast-integration-tests (3.8, macos-latest)
The operation was canceled.
|