Skip to content

fix(sast): fix sast reachability report format #11803

fix(sast): fix sast reachability report format

fix(sast): fix sast reachability report format #11803

Triggered via pull request October 25, 2023 11:47
Status Failure
Total duration 12m 2s
Artifacts

pr-test.yml

on: pull_request
Matrix: cdk-integration-tests
Matrix: integration-tests
Matrix: sast-integration-tests
Matrix: unit-tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
cdk-integration-tests (3.8, ubuntu-latest)
Process completed with exit code 1.
cdk-integration-tests (3.8, macos-latest)
The job was canceled because "_3_8_ubuntu-latest" failed.
cdk-integration-tests (3.8, macos-latest)
The operation was canceled.
sast-integration-tests (3.8, ubuntu-latest)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
sast-integration-tests (3.8, ubuntu-latest)
The operation was canceled.
sast-integration-tests (3.8, macos-latest)
The job was canceled because "_3_8_ubuntu-latest" failed.
sast-integration-tests (3.8, macos-latest)
The operation was canceled.