Skip to content

build(deps): bump the go-dependencies group across 1 directory with 13 updates #87

build(deps): bump the go-dependencies group across 1 directory with 13 updates

build(deps): bump the go-dependencies group across 1 directory with 13 updates #87

Triggered via pull request October 7, 2024 23:08
Status Failure
Total duration 1m 5s
Artifacts

compatibility.yml

on: pull_request
Matrix: acceptance-combo
Fit to window
Zoom out
Zoom in

Annotations

14 errors
acceptance-combo (current, current, current)
not enough arguments in call to instructions.Parse
acceptance-combo (current, current, current)
Process completed with exit code 2.
acceptance-combo (previous, current, current)
The job was canceled because "current_current_current" failed.
acceptance-combo (previous, current, current)
not enough arguments in call to instructions.Parse
acceptance-combo (previous, current, current)
Process completed with exit code 2.
acceptance-combo (previous, current, previous)
The job was canceled because "current_current_current" failed.
acceptance-combo (previous, current, previous)
not enough arguments in call to instructions.Parse
acceptance-combo (previous, current, previous)
Process completed with exit code 2.
acceptance-combo (current, previous, previous)
The job was canceled because "current_current_current" failed.
acceptance-combo (current, previous, previous)
not enough arguments in call to instructions.Parse
acceptance-combo (current, previous, previous)
The operation was canceled.
acceptance-combo (current, current, previous)
The job was canceled because "current_current_current" failed.
acceptance-combo (current, current, previous)
not enough arguments in call to instructions.Parse
acceptance-combo (current, current, previous)
The operation was canceled.