chore(deps): update dependency element-hq/synapse to v1.120.0 #2158
integration_test.yaml
on: pull_request
integration-tests
/
Plan
8s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
4 errors
integration-tests / Build rock (synapse)
The process '/snap/bin/rockcraft' failed with exit code 1
|
integration-tests / Build charm (synapse)
The job was canceled because "rock_synapse_synapse_rock" failed.
|
integration-tests / Build charm (synapse)
The operation was canceled.
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2024-11-26T15-46-28-b7a2__plan
|
331 Bytes |
|