Skip to content

Contributing (#145) #72

Contributing (#145)

Contributing (#145) #72

Triggered via push October 10, 2023 09:31
Status Failure
Total duration 6h 0m 28s
Artifacts

on_push.yaml

on: push
Matrix: Run Tests / Integration
Run Tests  /  ...  /  Check libraries
30s
Run Tests / Check libraries / Check libraries
Run Tests  /  ...  /  Lint
13s
Run Tests / Check libraries / Lint
Run Tests  /  Lint
13s
Run Tests / Lint
Run Tests  /  Unit
15s
Run Tests / Unit
Publish Charm  /  Generate the Charm Matrix
Publish Charm / Generate the Charm Matrix
Matrix: Publish Charm / Publish Charm
Waiting for pending jobs
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
Run Tests / Integration (charm-integration)
The job running on runner GitHub Actions 24 has exceeded the maximum execution time of 360 minutes.
Run Tests / Integration (charm-integration)
The operation was canceled.
Run Tests / Integration (charm-integration)
You are running out of disk space. The runner will stop working when the machine runs out of disk space. Free space left: 70 MB