Skip to content

feat: Helix integration #60

feat: Helix integration

feat: Helix integration #60

Triggered via pull request September 30, 2024 14:14
Status Cancelled
Total duration 2m 15s
Artifacts 1

per-pr.yml

on: pull_request
Matrix: run_with_args
Fit to window
Zoom out
Zoom in

Annotations

14 errors
run_with_args (./.github/tests/mev-mock.yaml)
Process completed with exit code 1.
run_starlark
Process completed with exit code 1.
run_with_args (./.github/tests/mix-with-tools.yaml)
The job was canceled because "_github_tests_mev-mock_ya" failed.
run_with_args (./.github/tests/mix-with-tools.yaml)
The operation was canceled.
lint
Process completed with exit code 1.
run_with_args (./.github/tests/mix-persistence.yaml)
The job was canceled because "_github_tests_mev-mock_ya" failed.
run_with_args (./.github/tests/mix-persistence.yaml)
The operation was canceled.
run_with_args (./network_params.yaml)
The job was canceled because "_github_tests_mev-mock_ya" failed.
run_with_args (./network_params.yaml)
The operation was canceled.
run_with_args (./.github/tests/assertoor.yaml)
The job was canceled because "_github_tests_mev-mock_ya" failed.
run_with_args (./.github/tests/assertoor.yaml)
The operation was canceled.
run_with_args (./.github/tests/mev.yaml)
The job was canceled because "_github_tests_mev-mock_ya" failed.
run_with_args (./.github/tests/mev.yaml)
The operation was canceled.
assertoor
Canceling since a higher priority waiting request for 'tests-refs/pull/8/merge' exists

Artifacts

Produced during runtime
Name Size
enclave-dump-gh-11107966502
1.84 MB