Skip to content

Commit

Permalink
cleaning up requirements
Browse files Browse the repository at this point in the history
  • Loading branch information
keighrim authored Jan 19, 2023
1 parent ed1ba0d commit 4428a2c
Showing 1 changed file with 1 addition and 3 deletions.
4 changes: 1 addition & 3 deletions requirements.txt
Original file line number Diff line number Diff line change
@@ -1,5 +1,3 @@
mmif_python==0.2.2
lapps==0.0.2
clams_python==0.2.0
clams==0.0.5
clams-python==0.5.1
ffmpeg==1.4

0 comments on commit 4428a2c

Please sign in to comment.