Skip to content

fix(hz): proto go_package #3298

fix(hz): proto go_package

fix(hz): proto go_package #3298

Triggered via pull request December 25, 2023 13:20
Status Failure
Total duration 3m 37s
Artifacts

tests.yml

on: pull_request
Matrix: compat-test
Matrix: hz-test-unix
Matrix: hz-test-windows
Matrix: lint-and-ut
Matrix: ut-windows
Fit to window
Zoom out
Zoom in

Annotations

5 errors
lint-and-ut (1.18)
Process completed with exit code 1.
lint-and-ut (1.20)
The job was canceled because "_1_18" failed.
lint-and-ut (1.20)
The operation was canceled.
lint-and-ut (1.19)
The job was canceled because "_1_18" failed.
lint-and-ut (1.19)
The operation was canceled.