Merge master into develop #2981
Triggered via pull request
September 27, 2023 06:50
Status
Cancelled
Total duration
16m 10s
Artifacts
–
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
Annotations
8 errors
industrial_ci (main, humble)
Canceling since a higher priority waiting request for 'ROS2 tests-refs/pull/852/merge' exists
|
industrial_ci (main, humble)
The operation was canceled.
|
industrial_ci (testing, iron)
Canceling since a higher priority waiting request for 'ROS2 tests-refs/pull/852/merge' exists
|
industrial_ci (testing, iron)
The operation was canceled.
|
industrial_ci (testing, humble)
Canceling since a higher priority waiting request for 'ROS2 tests-refs/pull/852/merge' exists
|
industrial_ci (testing, humble)
The operation was canceled.
|
industrial_ci (main, iron)
Canceling since a higher priority waiting request for 'ROS2 tests-refs/pull/852/merge' exists
|
industrial_ci (main, iron)
The operation was canceled.
|