Log job failure even when there are retries configured #8488
Annotations
9 errors
2/4
Process completed with exit code 1.
|
1/4
Process completed with exit code 1.
|
1/4
Process completed with exit code 1.
|
py-3-latest
Canceling since a higher priority waiting request for 'functional tests-refs/pull/6169/merge' exists
|
py-3-latest
The operation was canceled.
|
macos 1/5
Canceling since a higher priority waiting request for 'functional tests-refs/pull/6169/merge' exists
|
macos 1/5
The operation was canceled.
|
macos 2/5
Canceling since a higher priority waiting request for 'functional tests-refs/pull/6169/merge' exists
|
macos 2/5
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
coverage_2-4
|
96.3 KB |
|
coverage_3-4
|
95.5 KB |
|
coverage_4-4
|
95.4 KB |
|
coverage__remote_background_indep_poll
|
101 KB |
|
coverage__remote_background_indep_tcp
|
99.8 KB |
|
coverage_flaky
|
99.3 KB |
|
cylc-run (1-4)
|
200 KB |
|