Skip to content

test-isolate

test-isolate #166

Triggered via schedule November 28, 2024 00:01
Status Failure
Total duration 1h 0m 36s
Artifacts

test-isolate.yml

on: schedule
nextest  /  build matrices
4s
nextest / build matrices
Matrix: nextest / test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
nextest / test integration (1/3) (aarch64-apple-darwin)
Process completed with exit code 100.
nextest / test integration (1/3) (x86_64-unknown-linux-gnu)
Process completed with exit code 100.
nextest / test integration (2/3) (x86_64-unknown-linux-gnu)
Process completed with exit code 100.
nextest / test integration (2/3) (x86_64-pc-windows-msvc)
Process completed with exit code 1.
nextest / test integration (3/3) (x86_64-pc-windows-msvc)
Process completed with exit code 1.
nextest / test integration (3/3) (aarch64-apple-darwin)
Process completed with exit code 100.
nextest / test integration / external (2/2) (x86_64-unknown-linux-gnu)
The job running on runner GitHub Actions 59 has exceeded the maximum execution time of 60 minutes.
nextest / test integration / external (2/2) (x86_64-unknown-linux-gnu)
The operation was canceled.
nextest / test integration / external (2/2) (aarch64-apple-darwin)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 60 minutes.
nextest / test integration / external (2/2) (aarch64-apple-darwin)
The operation was canceled.