Skip to content

Prerelease

Prerelease #31

Manually triggered September 19, 2023 20:39
Status Cancelled
Total duration 6m 18s
Artifacts 3
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

prerelease.yaml

on: workflow_dispatch
Matrix: build
Matrix: release
Fit to window
Zoom out
Zoom in

Annotations

53 errors
build (git-remote-gosh_v5_1_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v4_0_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v3_0_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v3_0_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_1_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_0_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v4_0_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_0_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_0_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_0_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_1_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_1_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_1_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh, git-remote-gosh-darwin-arm64)
The operation was canceled.
build (git-remote-gosh_v3_0_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v3_0_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v1_0_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v1_0_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v6_1_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_1_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v1_0_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v1_0_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v5_0_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_0_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v5_0_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_0_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v2_0_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v2_0_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v2_0_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v2_0_0, git-remote-gosh-darwin-arm64)
The operation was canceled.
build (git-remote-gosh_v1_0_0, git-remote-gosh-darwin-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v1_0_0, git-remote-gosh-darwin-arm64)
The operation was canceled.
build (git-remote-gosh_v5_1_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_1_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v4_0_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v4_0_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v3_0_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v3_0_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v4_0_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v4_0_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v2_0_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v2_0_0, git-remote-gosh-darwin-amd64)
The operation was canceled.
build (git-remote-gosh_v6_0_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_0_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v5_1_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v5_1_0, git-remote-gosh-linux-arm64)
The operation was canceled.
build (git-remote-gosh_v2_0_0, git-remote-gosh-linux-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v2_0_0, git-remote-gosh-linux-amd64)
The operation was canceled.
build (git-remote-gosh_v1_0_0, git-remote-gosh-darwin-amd64)
The run was canceled by @awnion.
build (git-remote-gosh_v1_0_0, git-remote-gosh-darwin-amd64)
The operation was canceled.
build (git-remote-gosh_v6_0_0, git-remote-gosh-linux-arm64)
The run was canceled by @awnion.
build (git-remote-gosh_v6_0_0, git-remote-gosh-linux-arm64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
git-remote-gosh-darwin-amd64--git-remote-gosh Expired
829 KB
git-remote-gosh-linux-amd64--git-remote-gosh Expired
1010 KB
git-remote-gosh-linux-arm64--git-remote-gosh Expired
908 KB