Skip to content

Tiding up and building out #28

Tiding up and building out

Tiding up and building out #28

Triggered via push November 3, 2024 20:38
Status Failure
Total duration 38s
Billable time 16m
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

31 errors
P8.3 - L10.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.2 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.3 - L11.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L11.* - prefer-stable - ubuntu-latest
Process completed with exit code 1.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L11.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L10.* - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L10.* - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L11.* - prefer-stable - windows-latest
The operation was canceled.
P8.3 - L10.* - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L10.* - prefer-stable - windows-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.2 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.3 - L10.* - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_3_10____2" failed.
P8.3 - L10.* - prefer-lowest - ubuntu-latest
The operation was canceled.