Skip to content

Commit

Permalink
generate static site
Browse files Browse the repository at this point in the history
  • Loading branch information
lorenz-g committed Mar 22, 2024
1 parent cdac537 commit b740753
Show file tree
Hide file tree
Showing 340 changed files with 14,595 additions and 8,235 deletions.
2 changes: 1 addition & 1 deletion docs/ajax-data.json
Original file line number Diff line number Diff line change
@@ -1 +1 @@
{"project_length": {"tesla_str": "(72)", "all_str": "(1190)"}}
{"project_length": {"tesla_str": "(76)", "all_str": "(1200)"}}
13,912 changes: 7,106 additions & 6,806 deletions docs/all-big-batteries.html

Large diffs are not rendered by default.

1,110 changes: 996 additions & 114 deletions docs/gov-us-eia.html

Large diffs are not rendered by default.

916 changes: 518 additions & 398 deletions docs/index.html

Large diffs are not rendered by default.

44 changes: 30 additions & 14 deletions docs/misc/big-battery-projects.csv

Large diffs are not rendered by default.

2 changes: 1 addition & 1 deletion docs/misc/big-battery-projects.json

Large diffs are not rendered by default.

24 changes: 15 additions & 9 deletions docs/projects/1.html
Original file line number Diff line number Diff line change
Expand Up @@ -95,23 +95,21 @@ <h3> Kapolei Energy Storage <span data-toggle="tooltip" data-placement="top" tit
</tr>
<tr>
<td>Construction start</td>
<td>2021-08-25</td>
<td></td>
</tr>
<tr>
<td>Operation start</td>
<td>2024-01-11</td>
<td>2023-12</td>
</tr>
<tr>
<td>Estimated start</td>
<td>2023-12</td>
<td></td>
</tr>

<tr>
<td>Construction time</td>
<td>

29 months -> 19 MWh/m

</td>
</tr>
</table>
Expand All @@ -136,7 +134,7 @@ <h3> Kapolei Energy Storage <span data-toggle="tooltip" data-placement="top" tit
<dl>megapack / 158 / </dl>

<dt>Customer / Owner / Developer</dt>
<dl>Hawaiian Electric / Kapolei Energy Storage I, LLC / </dl>
<dl>Hawaiian Electric / Kapolei Energy Storage I, LLC / Plus Power </dl>


<dt>Use case </dt>
Expand Down Expand Up @@ -200,7 +198,7 @@ <h3> U.S. EIA data </h3>



Info from the <code>2024-01</code> report (Project first appeared in the <code>2023-01</code> report):<br>
Info from the <code>2024-02</code> report (Project first appeared in the <code>2023-01</code> report):<br>

<br>
<dt>Plant Name / State</dt>
Expand All @@ -210,7 +208,7 @@ <h3> U.S. EIA data </h3>
<dl>2023-12 / 185MW</dl>

<dt>status / status verbose</dt>
<dl>construction / (TS) Construction complete, but not yet in commercial operation </dl>
<dl>operation / operation </dl>

<dt>Plant id / generator id </dt>
<dl>66067 / KES1</dl>
Expand All @@ -221,6 +219,14 @@ <h3> U.S. EIA data </h3>
<b>Changes:</b><br>


<b>2024-02</b><br>

status: construction -> operation 🍾 🎉 🍸<br>

status_verbose: (TS) Construction complete, but not yet in commercial operation -> operation <br>
<!-- field -->


<b>2023-10</b><br>

date: 2023-08 -> 2023-12 <span class="badge rounded-pill bg-danger">delayed by 4 months</span><br>
Expand Down Expand Up @@ -304,7 +310,7 @@ <h3> U.S. EIA data </h3>
// var projects = '';
// projects = JSON.parse(projects)
// could also have the json as static file and load it here...
var projects = [ {"construction_speed_mwh_per_month": 19, "construction_time_month": 29, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "coords_hint": 1, "country": "usa", "csv": {"capacity_mwh": "565", "cells": "", "city": "", "coords_hint": "1", "cost_currency": "", "cost_incl_solar": "", "cost_million": "", "country": "usa", "customer": "Hawaiian Electric", "date_first_heard": "", "developer": "", "estimate_mwh": "", "external_id": "66067", "id": "1", "lat": "21.328169", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": "", "long": "-158.105085", "manufacturer": "tesla", "name": "Kapolei Energy Storage", "no_of_battery_units": "158", "notes": "", "owner": "", "power_mw": "185", "project_website": "https://www.kapoleienergystorage.com/overview", "start_construction": "2021-08-25", "start_estimated": "", "start_operation": "2024-01-11", "state": "hawaii", "status": "operation", "type": "megapack", "use_case": "island, black start"}, "date_first_heard": "2023-01", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"government data available\"\u003e\ud83d\udcca\u003c/span\u003e\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"user data available\"\u003e\ud83d\udc64\u003c/span\u003e", "external_id": "66067", "go_live": "2024-01", "go_live_year_int": 2024, "google_maps_link": "http://maps.google.com/maps?z=19\u0026t=k\u0026q=loc:21.328169+-158.105085", "gov": {"coords_hint": -1, "country": "usa", "data_source": "us_eia", "date_first_heard": "2023-01", "estimate_mwh": 370, "external_id": "66067", "has_multiple_projects": false, "lat": "", "long": "", "month_disappeared": "", "mwh": 0, "name": "Kapolei Energy Storage", "owner": "Kapolei Energy Storage I, LLC", "power_mw": 185, "pr_url": "", "start_construction": "", "start_estimated": "2023-12", "start_operation": "", "state": "hawaii", "status": "construction"}, "gov_history": {"KES1": {"changes": [{"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2023-05", "name": "date", "to": "2023-06"}], "month": "2023-02"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2023-06", "name": "date", "to": "2023-07"}], "month": "2023-06"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2023-07", "name": "date", "to": "2023-08"}], "month": "2023-07"}, {"li": [{"change_type": "misc", "extra": "", "from": "(V) Under construction, more than 50 percent complete", "name": "status_verbose", "to": "(TS) Construction complete, but not yet in commercial operation"}], "month": "2023-08"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 4 months\u003c/span\u003e", "from": "2023-08", "name": "date", "to": "2023-12"}], "month": "2023-10"}], "current": {"date": "2023-12", "energy source code": "MWH", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "ext_id": "66067", "generator id": "KES1", "month": "12", "mw": 185, "net summer capacity (mw)": "185", "plant id": "66067", "plant name": "Kapolei Energy Storage", "plant producer type": "IPP", "plant state": "HI", "prime mover code": "BA", "status": "construction", "status_verbose": "(TS) Construction complete, but not yet in commercial operation", "technology": "Batteries", "year": "2023"}, "current_month": "2024-01", "dates": {"first_heard": "2023-01", "start_construction": null}, "first": {"date": "2023-05", "energy source code": "MWH", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "ext_id": "66067", "generator id": "KES1", "month": "5", "mw": 185, "net summer capacity (mw)": "185", "plant id": "66067", "plant name": "Kapolei Energy Storage", "plant producer type": "IPP", "plant state": "HI", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "technology": "Batteries", "year": "2023"}, "first_month": "2023-01", "month_disappeared": ""}}, "has_gov_data": true, "has_user_data": true, "heart_tooltip": "", "in_construction": false, "in_operation": true, "in_planning": false, "internal_id": "1", "is_active": true, "is_megapack": true, "is_tesla": true, "lat": "21.328169", "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "https://twitter.com/Tesla_Megapack/status/1745499330612748482"], "long": "-158.105085", "month_disappeared": "", "mw": 185, "mwh": 565, "mwh_estimate": 370, "mwh_is_estimate": false, "name": "Kapolei Energy Storage", "name_short": "Kapolei", "no_of_battery_units": 158, "notes_split": [""], "owner": "Kapolei Energy Storage I, LLC", "start_construction": "2021-08-25", "start_estimated": "2023-12", "start_operation": "2024-01-11", "state": "hawaii", "status": "operation", "status_class": "badge rounded-pill bg-success"}];
var projects = [ {"construction_speed_mwh_per_month": null, "construction_time_month": null, "coords_exact": true, "coords_help_str": "\u2705 Coords are exact (+/- 50m)", "coords_hint": 1, "country": "usa", "csv": {"capacity_mwh": "565", "cells": "", "city": "", "coords_hint": "1", "cost_currency": "", "cost_incl_solar": "", "cost_million": "", "country": "usa", "customer": "Hawaiian Electric", "date_first_heard": "", "developer": "Plus Power", "estimate_mwh": "", "external_id": "66067", "id": "1", "lat": "21.328169", "link1": "https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "link2": "https://twitter.com/Tesla_Megapack/status/1745499330612748482", "link3": "", "link4": "", "long": "-158.105085", "manufacturer": "tesla", "name": "Kapolei Energy Storage", "no_of_battery_units": "158", "notes": "", "owner": "", "power_mw": "185", "project_website": "https://www.kapoleienergystorage.com/overview", "start_construction": "2021-08-25", "start_estimated": "", "start_operation": "2024-01-11", "state": "hawaii", "status": "operation", "type": "megapack", "use_case": "island, black start"}, "date_first_heard": "2023-01", "emojis": "\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"government data available\"\u003e\ud83d\udcca\u003c/span\u003e\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"user data available\"\u003e\ud83d\udc64\u003c/span\u003e", "external_id": "66067", "go_live": "2023-12", "go_live_year_int": 2023, "google_maps_link": "http://maps.google.com/maps?z=19\u0026t=k\u0026q=loc:21.328169+-158.105085", "gov": {"coords_hint": -1, "country": "usa", "data_source": "us_eia", "date_first_heard": "2023-01", "estimate_mwh": 370, "external_id": "66067", "has_multiple_projects": false, "lat": "", "long": "", "month_disappeared": "", "mwh": 0, "name": "Kapolei Energy Storage", "owner": "Kapolei Energy Storage I, LLC", "power_mw": 185, "pr_url": "", "start_construction": "", "start_estimated": "", "start_operation": "2023-12", "state": "hawaii", "status": "operation"}, "gov_history": {"KES1": {"changes": [{"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2023-05", "name": "date", "to": "2023-06"}], "month": "2023-02"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2023-06", "name": "date", "to": "2023-07"}], "month": "2023-06"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2023-07", "name": "date", "to": "2023-08"}], "month": "2023-07"}, {"li": [{"change_type": "misc", "extra": "", "from": "(V) Under construction, more than 50 percent complete", "name": "status_verbose", "to": "(TS) Construction complete, but not yet in commercial operation"}], "month": "2023-08"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 4 months\u003c/span\u003e", "from": "2023-08", "name": "date", "to": "2023-12"}], "month": "2023-10"}, {"li": [{"change_type": "status", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "from": "construction", "name": "status", "to": "operation"}, {"change_type": "misc", "extra": "", "from": "(TS) Construction complete, but not yet in commercial operation", "name": "status_verbose", "to": "operation"}], "month": "2024-02"}], "current": {"date": "2023-12", "energy source code": "MWH", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "ext_id": "66067", "generator id": "KES1", "month": "12", "mw": 185, "net summer capacity (mw)": "185", "plant id": "66067", "plant name": "Kapolei Energy Storage", "plant producer type": "IPP", "plant state": "HI", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "technology": "Batteries", "year": "2023"}, "current_month": "2024-02", "dates": {"first_heard": "2023-01", "start_construction": null}, "first": {"date": "2023-05", "energy source code": "MWH", "entity id": "65234", "entity name": "Kapolei Energy Storage I, LLC", "ext_id": "66067", "generator id": "KES1", "month": "5", "mw": 185, "net summer capacity (mw)": "185", "plant id": "66067", "plant name": "Kapolei Energy Storage", "plant producer type": "IPP", "plant state": "HI", "prime mover code": "BA", "status": "construction", "status_verbose": "(V) Under construction, more than 50 percent complete", "technology": "Batteries", "year": "2023"}, "first_month": "2023-01", "month_disappeared": ""}}, "has_gov_data": true, "has_user_data": true, "heart_tooltip": "", "in_construction": false, "in_operation": true, "in_planning": false, "internal_id": "1", "is_active": true, "is_megapack": true, "is_tesla": true, "lat": "21.328169", "links": ["https://www.tesmanian.com/blogs/tesmanian-blog/tesla-565-mwh-megapack-project-in-hawaii-celebrates-groundbreaking-ceremony", "https://twitter.com/Tesla_Megapack/status/1745499330612748482"], "long": "-158.105085", "month_disappeared": "", "mw": 185, "mwh": 565, "mwh_estimate": 370, "mwh_is_estimate": false, "name": "Kapolei Energy Storage", "name_short": "Kapolei", "no_of_battery_units": 158, "notes_split": [""], "owner": "Kapolei Energy Storage I, LLC", "start_construction": "", "start_estimated": "", "start_operation": "2023-12", "state": "hawaii", "status": "operation", "status_class": "badge rounded-pill bg-success"}];

generateBatteryMap(projects, 'mapid', zoom_to_first_project=true);

Expand Down
Loading

0 comments on commit b740753

Please sign in to comment.