Skip to content

Commit

Permalink
genenerate static site
Browse files Browse the repository at this point in the history
  • Loading branch information
lorenz-g committed Oct 9, 2023
1 parent 920d4c1 commit c91b3fb
Show file tree
Hide file tree
Showing 7 changed files with 75 additions and 59 deletions.
2 changes: 1 addition & 1 deletion docs/ajax-data.json
Original file line number Diff line number Diff line change
@@ -1 +1 @@
{"project_length": {"tesla_str": "(71)", "all_str": "(1057)"}}
{"project_length": {"tesla_str": "(72)", "all_str": "(1057)"}}
44 changes: 22 additions & 22 deletions docs/all-big-batteries.html

Large diffs are not rendered by default.

54 changes: 34 additions & 20 deletions docs/index.html

Large diffs are not rendered by default.

2 changes: 1 addition & 1 deletion docs/misc/big-battery-projects.csv
Original file line number Diff line number Diff line change
Expand Up @@ -189,7 +189,7 @@ Top Gun Energy Storage,,189,61366,california,usa,,60,30,,San Diego Gas & Electri
"Johanna Energy Center, LLC",,190,63843,california,usa,,40,20,,"Johanna Energy Center, LLC",,,,,,operation,,,2021-06-01,,,,,,,,,,,,,,
Renz Energy Storage,,191,63529,california,usa,,40,20,,Pacific Gas & Electric Co.,,,,,,planning,,,,2022-05,,,,,,,,,,,,,
Edwards Sanborn E3 ,,192,64877,california,usa,,24,12,,Terra-Gen Operating Co-Hybrid,,,,,,construction,,,,2021-12,,,,,,,,,,,,,
Silverstrand Grid Energy Storage System,,193,63735,california,usa,,22,11,,"Silverstrand Grid, LLC",,,,,,operation,,,2021-04-01,,,,,,,,,,,,,,
Silverstrand Grid Energy Storage System,,193,63735,california,usa,46,,11,,"Silverstrand Grid, LLC",,tesla,megapack,,15,operation,,,2021-04-01,,,,,34.205195,-119.058256,3,,Using 3.1MWh to get from the packs to capacity,,https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/,,,
Camino Solar,,194,63508,california,usa,,22,11,,Avangrid Renewables LLC,,,,,,planning,,,,2022-05,,,,,,,,,,,,,
Stanton Energy Reliability Center Hybrid,,195,60698,california,usa,,20,10,,"Wellhead Energy, LLC",,,,,,operation,,,2020-08-01,,,,,,,,,,,,,,
Henrietta D Energy Storage LLC,,196,60641,california,usa,,20,10,,Convergent Energy and Power LP,,,,,,construction,,,,2021-09,,,,,,,,,,,,,
Expand Down
2 changes: 1 addition & 1 deletion docs/misc/big-battery-projects.excel.csv
Original file line number Diff line number Diff line change
Expand Up @@ -189,7 +189,7 @@ Top Gun Energy Storage,,189,61366,california,usa,,60,30,,San Diego Gas & Electri
"Johanna Energy Center, LLC",,190,63843,california,usa,,40,20,,"Johanna Energy Center, LLC",,,,,,operation,,,2021-06-01,,,,,,,,,,,,,,
Renz Energy Storage,,191,63529,california,usa,,40,20,,Pacific Gas & Electric Co.,,,,,,planning,,,,2022-05,,,,,,,,,,,,,
Edwards Sanborn E3 ,,192,64877,california,usa,,24,12,,Terra-Gen Operating Co-Hybrid,,,,,,construction,,,,2021-12,,,,,,,,,,,,,
Silverstrand Grid Energy Storage System,,193,63735,california,usa,,22,11,,"Silverstrand Grid, LLC",,,,,,operation,,,2021-04-01,,,,,,,,,,,,,,
Silverstrand Grid Energy Storage System,,193,63735,california,usa,46,,11,,"Silverstrand Grid, LLC",,tesla,megapack,,15,operation,,,2021-04-01,,,,,34.205195,-119.058256,3,,Using 3.1MWh to get from the packs to capacity,,https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/,,,
Camino Solar,,194,63508,california,usa,,22,11,,Avangrid Renewables LLC,,,,,,planning,,,,2022-05,,,,,,,,,,,,,
Stanton Energy Reliability Center Hybrid,,195,60698,california,usa,,20,10,,"Wellhead Energy, LLC",,,,,,operation,,,2020-08-01,,,,,,,,,,,,,,
Henrietta D Energy Storage LLC,,196,60641,california,usa,,20,10,,Convergent Energy and Power LP,,,,,,construction,,,,2021-09,,,,,,,,,,,,,
Expand Down
2 changes: 1 addition & 1 deletion docs/misc/big-battery-projects.json

Large diffs are not rendered by default.

28 changes: 15 additions & 13 deletions docs/projects/193.html
Original file line number Diff line number Diff line change
Expand Up @@ -19,14 +19,14 @@

<title>

Silverstrand Grid Energy Storage System (22MWh)
Silverstrand Grid Energy Storage System (46MWh)

</title>


<meta name="description" content="detail page for Silverstrand Grid Energy Storage System big battery">

<meta property="og:title" content="Silverstrand Grid Energy Storage System (22MWh)" />
<meta property="og:title" content="Silverstrand Grid Energy Storage System (46MWh)" />
<meta property="og:description" content="detail page for Silverstrand Grid Energy Storage System big battery" />
<meta property="og:image" content="https://lorenz-g.github.io/tesla-megapack-tracker/pics/logo.jpg" />

Expand Down Expand Up @@ -74,7 +74,7 @@
<div class="container-xl">


<h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-placement="top" title="location not exactly known">📍</span><span data-toggle="tooltip" data-placement="top" title="government data available">📊</span><span data-toggle="tooltip" data-placement="top" title="mwh estimate based on mw">📏</span> </h3>
<h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-placement="top" title="location not exactly known">📍</span><span data-toggle="tooltip" data-placement="top" title="government data available">📊</span><span data-toggle="tooltip" data-placement="top" title="user data available">👤</span> </h3>

<dt>Status </dt>
<dl><span class="badge rounded-pill bg-success">operation</span> </dl>
Expand Down Expand Up @@ -107,7 +107,7 @@ <h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-pl
<td>Construction time</td>
<td>

3 months -> 7 MWh/m
3 months -> 15 MWh/m

</td>
</tr>
Expand All @@ -117,8 +117,8 @@ <h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-pl

<dt>Capacity in MWh </dt>
<dl>
22
<br>📏 This is an estimate
46


</dl>

Expand All @@ -127,10 +127,10 @@ <h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-pl
<dl>11</dl>

<dt>Manufacturer </dt>
<dl> </dl>
<dl>tesla </dl>

<dt>Type / Number of Packs / Cells </dt>
<dl> / / </dl>
<dl>megapack / 15 / </dl>

<dt>Customer / Owner / Developer</dt>
<dl> / Silverstrand Grid, LLC / </dl>
Expand All @@ -140,12 +140,12 @@ <h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-pl
<dl></dl>

<dt>Link to google maps satellite view</dt>
<dl><a href="http://maps.google.com/maps?z=19&t=k&q=loc:40.92365881938377+-121.44464417206395" target="_blank">http://maps.google.com/maps?z=19&t=k&q=loc:40.92365881938377+-121.44464417206395</a> </dl>
<dl><a href="http://maps.google.com/maps?z=19&t=k&q=loc:34.205195+-119.058256" target="_blank">http://maps.google.com/maps?z=19&t=k&q=loc:34.205195+-119.058256</a> </dl>

<dt>Coordinates </dt>
<dl>
40.92365881938377, -121.44464417206395
<br> 📍 Coords are a guess. Only the state is known
34.205195, -119.058256
<br> 📍 Coords are a guess. Only the city or county is known
</dl>

<div class="row">
Expand All @@ -157,7 +157,7 @@ <h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-pl
<dt>Notes </dt>
<dl>

<br>
Using 3.1MWh to get from the packs to capacity <br>

</dl>

Expand All @@ -166,6 +166,8 @@ <h3> Silverstrand Grid Energy Storage System <span data-toggle="tooltip" data-pl

<dt> Sources </dt>
<dl>

<a href="https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/" target="_blank">https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/ </a> <br>

</dl>

Expand Down Expand Up @@ -295,7 +297,7 @@ <h3> U.S. EIA data </h3>
// var projects = '';
// projects = JSON.parse(projects)
// could also have the json as static file and load it here...
var projects = [ {"construction_speed_mwh_per_month": 7, "construction_time_month": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the state is known", "coords_hint": -1, "country": "usa", "csv": {"capacity_mwh": "", "cells": "", "city": "", "coords_hint": "", "cost_currency": "", "cost_incl_solar": "", "cost_million": "", "country": "usa", "customer": "", "date_first_heard": "", "developer": "", "estimate_mwh": "22", "external_id": "63735", "id": "193", "lat": "", "link1": "", "link2": "", "link3": "", "link4": "", "long": "", "manufacturer": "", "name": "Silverstrand Grid Energy Storage System", "no_of_battery_units": "", "notes": "", "owner": "Silverstrand Grid, LLC", "power_mw": "11", "project_website": "", "start_construction": "", "start_estimated": "", "start_operation": "2021-04-01", "state": "california", "status": "operation", "type": "", "use_case": ""}, "date_first_heard": "2020-09", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udccf", "emojis_with_tooltips": "\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"location not exactly known\"\u003e\ud83d\udccd\u003c/span\u003e\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"government data available\"\u003e\ud83d\udcca\u003c/span\u003e\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"mwh estimate based on mw\"\u003e\ud83d\udccf\u003c/span\u003e", "external_id": "63735", "flag": "\ud83c\uddfa\ud83c\uddf8", "go_live": "2021-04", "go_live_year_int": 2021, "google_maps_link": "http://maps.google.com/maps?z=19\u0026t=k\u0026q=loc:40.92365881938377+-121.44464417206395", "gov": {"coords_hint": -1, "country": "usa", "data_source": "us_eia", "date_first_heard": "2020-09", "estimate_mwh": 22, "external_id": "63735", "has_multiple_projects": false, "lat": "", "long": "", "month_disappeared": "", "mwh": 0, "name": "Silverstrand Grid Energy Storage System", "owner": "Silverstrand Grid, LLC", "power_mw": 11, "pr_url": "", "start_construction": "2021-01", "start_estimated": "", "start_operation": "2021-04", "state": "california", "status": "operation"}, "gov_history": {"SLV01": {"changes": [{"li": [{"change_type": "status", "extra": "\ud83c\udfd7\ufe0f", "from": "planning", "name": "status", "to": "construction"}, {"change_type": "misc", "extra": "", "from": "(L) Regulatory approvals pending. Not under construction", "name": "status_verbose", "to": "(U) Under construction, less than or equal to 50 percent complete"}], "month": "2021-01"}, {"li": [{"change_type": "misc", "extra": "", "from": "(U) Under construction, less than or equal to 50 percent complete", "name": "status_verbose", "to": "(V) Under construction, more than 50 percent complete"}], "month": "2021-02"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2021-03", "name": "date", "to": "2021-04"}], "month": "2021-04"}, {"li": [{"change_type": "status", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "from": "construction", "name": "status", "to": "operation"}, {"change_type": "misc", "extra": "", "from": "(V) Under construction, more than 50 percent complete", "name": "status_verbose", "to": "operation"}], "month": "2021-06"}], "current": {"date": "2021-04", "energy source code": "MWH", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "ext_id": "63735", "generator id": "SLV01", "month": "4", "mw": 11, "net summer capacity (mw)": "11", "plant id": "63735", "plant name": "Silverstrand Grid Energy Storage System", "plant producer type": "IPP", "plant state": "CA", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "technology": "Batteries", "year": "2021"}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "first": {"date": "2021-03", "energy source code": "MWH", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "ext_id": "63735", "generator id": "SLV01", "month": "3", "mw": 11, "net summer capacity (mw)": "11", "plant id": "63735", "plant name": "Silverstrand Grid Energy Storage System", "plant producer type": "IPP", "plant state": "CA", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "technology": "Batteries", "year": "2021"}, "first_month": "2020-09", "month_disappeared": ""}}, "has_gov_data": true, "has_user_data": false, "in_construction": false, "in_operation": true, "in_planning": false, "internal_id": "193", "is_active": true, "is_megapack": false, "is_tesla": false, "lat": "40.92365881938377", "links": [], "long": "-121.44464417206395", "month_disappeared": "", "mw": 11, "mwh": 22, "mwh_estimate": 22, "mwh_is_estimate": true, "name": "Silverstrand Grid Energy Storage System", "name_short": "Silverstrand Grid Energy ...", "no_of_battery_units": 0, "notes_split": [""], "owner": "Silverstrand Grid, LLC", "start_construction": "2021-01", "start_estimated": "", "start_operation": "2021-04", "state": "california", "status": "operation", "status_class": "badge rounded-pill bg-success"}];
var projects = [ {"construction_speed_mwh_per_month": 15, "construction_time_month": 3, "coords_exact": false, "coords_help_str": "\ud83d\udccd Coords are a guess. Only the city or county is known", "coords_hint": 3, "country": "usa", "csv": {"capacity_mwh": "46", "cells": "", "city": "", "coords_hint": "3", "cost_currency": "", "cost_incl_solar": "", "cost_million": "", "country": "usa", "customer": "", "date_first_heard": "", "developer": "", "estimate_mwh": "", "external_id": "63735", "id": "193", "lat": "34.205195", "link1": "https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/", "link2": "", "link3": "", "link4": "", "long": "-119.058256", "manufacturer": "tesla", "name": "Silverstrand Grid Energy Storage System", "no_of_battery_units": "15", "notes": "Using 3.1MWh to get from the packs to capacity", "owner": "Silverstrand Grid, LLC", "power_mw": "11", "project_website": "", "start_construction": "", "start_estimated": "", "start_operation": "2021-04-01", "state": "california", "status": "operation", "type": "megapack", "use_case": ""}, "date_first_heard": "2020-09", "emojis": "\ud83d\udccd\ud83d\udcca\ud83d\udc64", "emojis_with_tooltips": "\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"location not exactly known\"\u003e\ud83d\udccd\u003c/span\u003e\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"government data available\"\u003e\ud83d\udcca\u003c/span\u003e\u003cspan data-toggle=\"tooltip\" data-placement=\"top\" title=\"user data available\"\u003e\ud83d\udc64\u003c/span\u003e", "external_id": "63735", "flag": "\ud83c\uddfa\ud83c\uddf8", "go_live": "2021-04", "go_live_year_int": 2021, "google_maps_link": "http://maps.google.com/maps?z=19\u0026t=k\u0026q=loc:34.205195+-119.058256", "gov": {"coords_hint": -1, "country": "usa", "data_source": "us_eia", "date_first_heard": "2020-09", "estimate_mwh": 22, "external_id": "63735", "has_multiple_projects": false, "lat": "", "long": "", "month_disappeared": "", "mwh": 0, "name": "Silverstrand Grid Energy Storage System", "owner": "Silverstrand Grid, LLC", "power_mw": 11, "pr_url": "", "start_construction": "2021-01", "start_estimated": "", "start_operation": "2021-04", "state": "california", "status": "operation"}, "gov_history": {"SLV01": {"changes": [{"li": [{"change_type": "status", "extra": "\ud83c\udfd7\ufe0f", "from": "planning", "name": "status", "to": "construction"}, {"change_type": "misc", "extra": "", "from": "(L) Regulatory approvals pending. Not under construction", "name": "status_verbose", "to": "(U) Under construction, less than or equal to 50 percent complete"}], "month": "2021-01"}, {"li": [{"change_type": "misc", "extra": "", "from": "(U) Under construction, less than or equal to 50 percent complete", "name": "status_verbose", "to": "(V) Under construction, more than 50 percent complete"}], "month": "2021-02"}, {"li": [{"change_type": "timing", "extra": "\u003cspan class=\"badge rounded-pill bg-danger\"\u003edelayed by 1 month\u003c/span\u003e", "from": "2021-03", "name": "date", "to": "2021-04"}], "month": "2021-04"}, {"li": [{"change_type": "status", "extra": "\ud83c\udf7e \ud83c\udf89 \ud83c\udf78", "from": "construction", "name": "status", "to": "operation"}, {"change_type": "misc", "extra": "", "from": "(V) Under construction, more than 50 percent complete", "name": "status_verbose", "to": "operation"}], "month": "2021-06"}], "current": {"date": "2021-04", "energy source code": "MWH", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "ext_id": "63735", "generator id": "SLV01", "month": "4", "mw": 11, "net summer capacity (mw)": "11", "plant id": "63735", "plant name": "Silverstrand Grid Energy Storage System", "plant producer type": "IPP", "plant state": "CA", "prime mover code": "BA", "status": "operation", "status_verbose": "operation", "technology": "Batteries", "year": "2021"}, "current_month": "2022-02", "dates": {"first_heard": "2020-09", "start_construction": "2021-01"}, "first": {"date": "2021-03", "energy source code": "MWH", "entity id": "63424", "entity name": "Silverstrand Grid, LLC", "ext_id": "63735", "generator id": "SLV01", "month": "3", "mw": 11, "net summer capacity (mw)": "11", "plant id": "63735", "plant name": "Silverstrand Grid Energy Storage System", "plant producer type": "IPP", "plant state": "CA", "prime mover code": "BA", "status": "planning", "status_verbose": "(L) Regulatory approvals pending. Not under construction", "technology": "Batteries", "year": "2021"}, "first_month": "2020-09", "month_disappeared": ""}}, "has_gov_data": true, "has_user_data": true, "in_construction": false, "in_operation": true, "in_planning": false, "internal_id": "193", "is_active": true, "is_megapack": true, "is_tesla": true, "lat": "34.205195", "links": ["https://beiconstruction.com/expanding-energy-storage-resources-with-tesla-megapacks/"], "long": "-119.058256", "month_disappeared": "", "mw": 11, "mwh": 46, "mwh_estimate": 22, "mwh_is_estimate": false, "name": "Silverstrand Grid Energy Storage System", "name_short": "Silverstrand Grid Energy ...", "no_of_battery_units": 15, "notes_split": ["Using 3.1MWh to get from the packs to capacity"], "owner": "Silverstrand Grid, LLC", "start_construction": "2021-01", "start_estimated": "", "start_operation": "2021-04", "state": "california", "status": "operation", "status_class": "badge rounded-pill bg-success"}];

generateBatteryMap(projects, 'mapid', zoom_to_first_project=true);

Expand Down

0 comments on commit c91b3fb

Please sign in to comment.