Skip to content

Bump requirements for the Open edX Quince release #355

Bump requirements for the Open edX Quince release

Bump requirements for the Open edX Quince release #355

Triggered via push January 11, 2024 10:51
Status Failure
Total duration 6m 10s
Artifacts 4

tox.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 8 warnings
build (3.9, 22.0.4)
InvocationError for command /home/runner/work/hastexo-xblock/hastexo-xblock/.tox/py39-xblock16-celery5/bin/python run_tests.py (exited with code 1)
build (3.9, 22.0.4)
py39-xblock16-celery5: commands failed
build (3.9, 22.0.4)
Process completed with exit code 1.
build (3.8, 22.0.4)
The job was canceled because "_3_9_22_0_4" failed.
build (3.8, 22.0.4)
The operation was canceled.
build (3.11, 22.0.4)
The process '/usr/bin/git' failed with exit code 128
build (3.9, 23.0.1)
The process '/usr/bin/git' failed with exit code 128
build (3.11, 23.0.1)
The process '/usr/bin/git' failed with exit code 128
build (3.8, 23.0.1)
The process '/usr/bin/git' failed with exit code 128
build (3.10, 23.0.1)
The process '/usr/bin/git' failed with exit code 128
build (3.10, 22.0.4)
The process '/usr/bin/git' failed with exit code 128
build (3.9, 22.0.4)
The process '/usr/bin/git' failed with exit code 128
build (3.8, 22.0.4)
The process '/usr/bin/git' failed with exit code 128

Artifacts

Produced during runtime
Name Size
coverage-3.10 Expired
312 KB
coverage-3.11 Expired
312 KB
coverage-3.8 Expired
312 KB
coverage-3.9 Expired
156 KB