Skip to content

Commit

Permalink
Updating tube lengths for vacuum lines
Browse files Browse the repository at this point in the history
  • Loading branch information
lucian151 committed Sep 5, 2024
1 parent 8b9d25a commit e53d244
Showing 1 changed file with 10 additions and 12 deletions.
22 changes: 10 additions & 12 deletions docs/lumen/control-box/index.md
Original file line number Diff line number Diff line change
Expand Up @@ -38,7 +38,6 @@ The purpose of these work instructions is to cover the assembly process for the
![alt text](img/IMG_1878.JPG)
![alt text](img/IMG_1879.JPG)


## Install pneumatics systems into `control-box`

### Install left-side pneumatic system
Expand All @@ -52,12 +51,11 @@ The purpose of these work instructions is to cover the assembly process for the
![alt text](img/IMG_1887.JPG)

### Install right-side pneumatic system
Repeat the above process to install the right-side pneumatic system
Repeat the above process to install the right-side pneumatic system

![alt text](img/IMG_1888.JPG)
![alt text](img/IMG_1889.JPG)


## Bolt 2x `reduction-tee-4-6-4` to `control-box`
- Use 2x `m3x30-socket-head` and 2x `m3-hex-nut` to attach 2x `reduction-tee-4-6-4` to `control-box`
![alt text](img/IMG_1890.JPG)
Expand All @@ -75,25 +73,25 @@ Repeat the above process to install the right-side pneumatic system
![alt text](img/IMG_1896.JPG)
![alt text](img/IMG_1897.JPG)


## Connect vacuum lines to `motherboard-rev05`
- Prepare a 180mm piece of `pu-tube-4x2.5-blue` and `pu-tube-4x2.5-red`
- Prepare a 145mm piece of `pu-tube-4x2.5-blue`
- Prepare a 165mm piece of `pu-tube-4x2.5-red`
- Gather 1pcs `motherboard-rev05` from inventory

![alt text](img/IMG_1898.JPG)

- Connect the tubes
- Connect `pu-tube-4x2.5-blue` to the vacuum sensor labled `Right Vac`
- Connect `pu-tube-4x2.5-red` to the vacuum sensor labeled `Left Vac`
- Connect `pu-tube-4x2.5-blue` to the vacuum sensor labled `Right Vac`
- Connect `pu-tube-4x2.5-red` to the vacuum sensor labeled `Left Vac`

![alt text](img/IMG_1900.JPG)

- When completed the assembly should resemble the image shown below:

![alt text](img/IMG_1899.JPG)

## Screw `motherboard-rev05` into `control-box`
- Place motherboard-rev05 into `control-box` while sliding the USB and barrel jack ports into the cutouts on the left side of the print
- Place motherboard-rev05 into `control-box` while sliding the USB and barrel jack ports into the cutouts on the left side of the print
![alt text](img/IMG_1901.JPG)
![alt text](img/IMG_1902.JPG)

Expand All @@ -118,16 +116,16 @@ Repeat the above process to install the right-side pneumatic system

## Serialize `control-box`
- Place a lid on control-box-asm

!!!warning "Confirm that both buttons click when pressed"

![alt text](img/IMG_2016.JPG)
- Slide a `box-sn-label` between `control-box` and `control-box-lid`
![alt text](img/IMG_2017.JPG)
- Flip the `control-box-asm` over and adhere a matching `machine-serial-label` to the `control-box`
![alt text](img/IMG_2014.JPG)
![alt text](img/IMG_2015.JPG)

!!!success "You may now proceed to Gundam Testing!"

## Gundam Testing
Expand Down

0 comments on commit e53d244

Please sign in to comment.