Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

en: add tiproxy docs #2480

Merged
merged 2 commits into from
Jan 17, 2024
Merged

en: add tiproxy docs #2480

merged 2 commits into from
Jan 17, 2024

Conversation

ran-huang
Copy link
Contributor

What is changed, added, or deleted? (Required)

Which TiDB Operator version(s) do your changes apply to? (Required)

  • master (the latest development version)
  • v1.5 (TiDB Operator 1.5 versions)
  • v1.4 (TiDB Operator 1.4 versions)
  • v1.3 (TiDB Operator 1.3 versions)
  • v1.2 (TiDB Operator 1.2 versions)

What is the related PR or file link(s)?

@ran-huang ran-huang added translation/from-zh This PR is translated from a PR in docs-tidb-operator/zh. needs-cherry-pick-release-1.5 Should cherry pick this PR to release-1.5 branch. labels Jan 5, 2024
@ran-huang ran-huang self-assigned this Jan 5, 2024
@ran-huang ran-huang requested a review from hfxsd January 5, 2024 06:46
@ti-chi-bot ti-chi-bot bot added the size/L Denotes a PR that changes 100-499 lines, ignoring generated files. label Jan 5, 2024
en/deploy-tiproxy.md Outdated Show resolved Hide resolved
en/scale-a-tidb-cluster.md Outdated Show resolved Hide resolved
en/scale-a-tidb-cluster.md Outdated Show resolved Hide resolved
@ti-chi-bot ti-chi-bot bot added the needs-1-more-lgtm Indicates a PR needs 1 more LGTM. label Jan 8, 2024
Copy link

ti-chi-bot bot commented Jan 8, 2024

[LGTM Timeline notifier]

Timeline:

  • 2024-01-08 04:13:30.517731791 +0000 UTC m=+243800.101985478: ☑️ agreed by hfxsd.

@ran-huang
Copy link
Contributor Author

/approve

@ran-huang ran-huang added the lgtm label Jan 17, 2024
Copy link

ti-chi-bot bot commented Jan 17, 2024

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: ran-huang

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot added the approved label Jan 17, 2024
@ti-chi-bot ti-chi-bot bot merged commit 1d5961a into pingcap:master Jan 17, 2024
12 of 13 checks passed
@ti-chi-bot
Copy link
Member

In response to a cherrypick label: new pull request created to branch release-1.5: #2489.

@ti-chi-bot ti-chi-bot mentioned this pull request Jan 17, 2024
5 tasks
@ran-huang ran-huang deleted the tiproxy-en branch January 17, 2024 03:29
ran-huang added a commit that referenced this pull request Jan 17, 2024
* add translation

* Apply suggestions from code review

Co-authored-by: xixirangrang <[email protected]>

---------

Co-authored-by: Ran <[email protected]>
Co-authored-by: Ran <[email protected]>
Co-authored-by: xixirangrang <[email protected]>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
approved lgtm needs-1-more-lgtm Indicates a PR needs 1 more LGTM. needs-cherry-pick-release-1.5 Should cherry pick this PR to release-1.5 branch. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. translation/from-zh This PR is translated from a PR in docs-tidb-operator/zh.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

3 participants