-
Notifications
You must be signed in to change notification settings - Fork 5.9k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
*: support cancel query like 'select * from information_schema.tables'
do-not-merge/needs-triage-completed
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57766
opened Nov 27, 2024 by
tiancaiamao
Loading…
1 of 13 tasks
*: bump client-go with some regression tests (#57282)
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-7.5
This PR is cherry-picked to release-7.5 from a source PR.
#57765
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
*: bump client-go with some regression tests (#57282)
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-7.1
This PR is cherry-picked to release-7.1 from a source PR.
#57764
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
*: bump client-go with some regression tests (#57282)
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#57763
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
*: bump client-go with some regression tests (#57282)
do-not-merge/cherry-pick-not-approved
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-8.1
This PR is cherry-picked to release-8.1 from a source PR.
#57761
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
planner: hide read-write fields of PlanCacheValue for safety
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#57759
opened Nov 27, 2024 by
qw4990
Loading…
1 of 13 tasks
ttl: make the default value of Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
ttl_job_interval
to 24h
approved
lgtm
release-note
#57758
opened Nov 27, 2024 by
lcwangchao
Loading…
1 of 13 tasks
statistics: avoid stats meta full load after table analysis
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#57756
opened Nov 27, 2024 by
Rustin170506
Loading…
1 of 13 tasks
statistics: rightly deal with timout when to send sync load (#57712)
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#57754
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
statistics: rightly deal with timout when to send sync load (#57712)
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-7.1
This PR is cherry-picked to release-7.1 from a source PR.
#57753
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
statistics: rightly deal with timout when to send sync load (#57712)
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
type/cherry-pick-for-release-7.5
This PR is cherry-picked to release-7.5 from a source PR.
#57752
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
statistics: rightly deal with timout when to send sync load (#57712)
cherry-pick-approved
Cherry pick PR approved by release team.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
type/cherry-pick-for-release-8.1
This PR is cherry-picked to release-8.1 from a source PR.
#57750
opened Nov 27, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
executor: fix query infoschema.tables table_schema/table_name with filter condition
approved
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57746
opened Nov 27, 2024 by
tiancaiamao
Loading…
2 of 13 tasks
br: reproduce insert gc failed due to slow schema reload
do-not-merge/needs-tests-checked
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#57742
opened Nov 26, 2024 by
Tristan1900
•
Draft
13 tasks
ddl: Fixed partition interval from DayMinute to just Minute.
do-not-merge/needs-triage-completed
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57738
opened Nov 26, 2024 by
mjonss
Loading…
1 of 13 tasks
infoschema: avoid mem allocs when searching table items
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57730
opened Nov 26, 2024 by
zyguan
Loading…
1 of 13 tasks
executor: fix the slow log getLineIndex() function
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#57727
opened Nov 26, 2024 by
tiancaiamao
•
Draft
13 tasks
*: Fix for TRUNCATE PARTITION and Global Index
approved
do-not-merge/cherry-pick-not-approved
lgtm
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#57724
opened Nov 26, 2024 by
mjonss
Loading…
2 of 13 tasks
statistics: fix some problem related to stats async load
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
needs-cherry-pick-release-6.5
Should cherry pick this PR to release-6.5 branch.
needs-cherry-pick-release-7.1
Should cherry pick this PR to release-7.1 branch.
needs-cherry-pick-release-7.5
Should cherry pick this PR to release-7.5 branch.
needs-cherry-pick-release-8.1
Should cherry pick this PR to release-8.1 branch.
needs-cherry-pick-release-8.5
Should cherry pick this PR to release-8.5 branch.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57723
opened Nov 26, 2024 by
winoros
Loading…
1 of 13 tasks
ttl: set a result for timeout scan task during shrinking scan worker
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#57718
opened Nov 26, 2024 by
YangKeao
Loading…
1 of 13 tasks
br: copy full backup to pitr storage
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
restore: set tidb_scatter_region to global before tables creation
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
br: Add retry limit of connection err in fine grained backup
approved
do-not-merge/cherry-pick-not-approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57713
opened Nov 26, 2024 by
RidRisR
Loading…
1 of 13 tasks
lightning: add precheck that PD and TiDB must belongs to same cluster
approved
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#57709
opened Nov 26, 2024 by
lance6716
Loading…
2 of 13 tasks
lightning: set the 17th bit of the txn_source to indicate the write source is lightning physical mode import
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#57706
opened Nov 26, 2024 by
3AceShowHand
Loading…
3 of 13 tasks
Previous Next
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.