Skip to content

chore(deps): fix pipeline configuration issue #31

chore(deps): fix pipeline configuration issue

chore(deps): fix pipeline configuration issue #31

Triggered via push April 9, 2024 17:19
Status Failure
Total duration 24s
Artifacts

cd-pipeline.yml

on: push
Deploy to test  /  Seed source tables
Deploy to test / Seed source tables
Deploy to test  /  Run source contract tests
Deploy to test / Run source contract tests
Deploy to test  /  Deploy
Deploy to test / Deploy
Deploy to test  /  Generate observability report
Deploy to test / Generate observability report
Fit to window
Zoom out
Zoom in

Annotations

1 error and 2 warnings
Test
Docker pull failed with exit code 1
Test
Docker pull failed with exit code 1, back off 4.934 seconds before retry.
Test
Docker pull failed with exit code 1, back off 3.79 seconds before retry.