Skip to content

nightly

nightly #992

Triggered via schedule November 16, 2023 00:10
Status Failure
Total duration 3h 2m 34s
Artifacts

nightly.yml

on: schedule
Spec  /  Setup Test Matrix
30s
Spec / Setup Test Matrix
Matrix: Spec / spec
Acceptance  /  Setup Test Matrix
26s
Acceptance / Setup Test Matrix
Matrix: Acceptance / acceptance
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Acceptance / Acceptance tests (RedHat-9-arm, puppet7-nightly)
Process completed with exit code 1.
Acceptance / Acceptance tests (RedHat-9-arm, puppet8-nightly)
Process completed with exit code 1.
Acceptance / Acceptance tests (CentOS-7, puppet7-nightly)
The job running on runner GitHub Actions 52 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (CentOS-7, puppet7-nightly)
The operation was canceled.
Acceptance / Acceptance tests (CentOS-7, puppet8-nightly)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (CentOS-7, puppet8-nightly)
The operation was canceled.
Acceptance / Acceptance tests (OracleLinux-7, puppet8-nightly)
The job running on runner GitHub Actions 176 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (OracleLinux-7, puppet8-nightly)
The operation was canceled.
Acceptance / Acceptance tests (OracleLinux-7, puppet7-nightly)
The job running on runner GitHub Actions 187 has exceeded the maximum execution time of 180 minutes.
Acceptance / Acceptance tests (OracleLinux-7, puppet7-nightly)
The operation was canceled.