Skip to content

Proxy request.signal through in vite dev #2306

Proxy request.signal through in vite dev

Proxy request.signal through in vite dev #2306

Triggered via pull request September 12, 2024 14:03
Status Cancelled
Total duration 49s
Artifacts

test-pr-ubuntu.yml

on: pull_request
⚙️ Build  /  build
35s
⚙️ Build / build
Matrix: 👀 Integration Test / integration
Matrix: 🧪 Unit Test / test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
👀 Integration Test / ubuntu-latest / node@20 / chromium
Canceling since a higher priority waiting request for 'PR (Base)-refs/pull/9976/merge' exists
👀 Integration Test / ubuntu-latest / node@20 / chromium
The operation was canceled.
⚙️ Build / build
Canceling since a higher priority waiting request for 'PR (Base)-refs/pull/9976/merge' exists
⚙️ Build / build
The operation was canceled.
🧪 Unit Test / ubuntu-latest / node@20
Canceling since a higher priority waiting request for 'PR (Base)-refs/pull/9976/merge' exists
🧪 Unit Test / ubuntu-latest / node@20
The operation was canceled.