testing: update IPv4 certificates for Minio #123
Triggered via pull request
November 4, 2024 11:07
Status
Cancelled
Total duration
11m 48s
Artifacts
–
integration-tests-2023.1.11-IPV6-raftschema.yaml
on: pull_request
Test backup
11m 31s
Test repair
11m 29s
Test restore schema
11m 29s
Test restore tables
11m 31s
Test other, smaller packages
11m 30s
Annotations
10 errors
Test repair
Canceling since a higher priority waiting request for 'int-integration-tests-2023.1.11-IPV6-raftschema-refs/pull/4097/merge' exists
|
Test repair
The operation was canceled.
|
Test restore schema
Canceling since a higher priority waiting request for 'int-integration-tests-2023.1.11-IPV6-raftschema-refs/pull/4097/merge' exists
|
Test restore schema
The operation was canceled.
|
Test restore tables
Canceling since a higher priority waiting request for 'int-integration-tests-2023.1.11-IPV6-raftschema-refs/pull/4097/merge' exists
|
Test restore tables
The operation was canceled.
|
Test backup
Canceling since a higher priority waiting request for 'int-integration-tests-2023.1.11-IPV6-raftschema-refs/pull/4097/merge' exists
|
Test backup
The operation was canceled.
|
Test other, smaller packages
Canceling since a higher priority waiting request for 'int-integration-tests-2023.1.11-IPV6-raftschema-refs/pull/4097/merge' exists
|
Test other, smaller packages
The operation was canceled.
|