feat(sca): Extending reachability post-runner in checkov and enriching cves with ReachableFunction data #11859
pr-test.yml
on: pull_request
lint
/
pre-commit
48s
danger-check
26s
cfn-lint
29s
mypy
/
mypy
54s
performance-tests
2m 20s
dogfood-tests
4m 2s
Matrix: cdk-integration-tests
Matrix: integration-tests
Matrix: sast-integration-tests
Matrix: unit-tests
Annotations
6 errors
mypy / mypy
Process completed with exit code 1.
|
cdk-integration-tests (3.11, ubuntu-latest)
Process completed with exit code 1.
|
cdk-integration-tests (3.8, macos-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
|
cdk-integration-tests (3.8, macos-latest)
The operation was canceled.
|
cdk-integration-tests (3.11, macos-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
|
cdk-integration-tests (3.11, macos-latest)
The operation was canceled.
|