Skip to content

Improve idr_download to support download of the full hyperstack #14820

Improve idr_download to support download of the full hyperstack

Improve idr_download to support download of the full hyperstack #14820

Triggered via pull request September 26, 2024 11:36
Status Cancelled
Total duration 6m 36s
Artifacts 1

pr.yaml

on: pull_request
Matrix: Setup cache and determine changed repositories
Matrix: Lint tool-list
Matrix: Lint Python scripts
Matrix: Lint R scripts
Matrix: Test tools
Check file sizes
43s
Check file sizes
Matrix: Combine chunked test results
Matrix: Deploy
Check workflow success
0s
Check workflow success
Report deploy status
0s
Report deploy status
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Lint Python scripts (3.11)
Process completed with exit code 123.
Test tools (0, 3.11)
Canceling since a higher priority waiting request for 'pr-refs/pull/6358/merge' exists
Combine chunked test results (3.11)
Process completed with exit code 2.
Check workflow success
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
Python linting output
257 Bytes