fix(STONEINTG-704): e2e tests should check if the finalizer is removed from Integration PLRs #966
Red Hat Konflux / Red Hat Trusted App Pipeline / e2e-on-pull-request
succeeded
Jan 5, 2024 in 5m 1s
Success
Red Hat Trusted App Pipeline/e2e-on-pull-request has successfully validated your commit.
Details
- Namespace: tekton-ci
- PipelineRun: e2e-on-pull-request-c4d2m
Task Statuses:
Status | Duration | Name |
---|---|---|
✅ Succeeded | 4 seconds | |
✅ Succeeded | 17 seconds | |
✅ Succeeded | 3 minutes | |
✅ Succeeded | 15 seconds | |
✅ Succeeded | 6 seconds | |
✅ Succeeded | 12 seconds | |
✅ Succeeded | 54 seconds | |
✅ Succeeded | 9 seconds | |
✅ Succeeded | 7 seconds | |
✅ Succeeded | 7 seconds |
Loading